Administración Portuaria Integral, Manzanillo, MX

Dramix Customer success- Administración Portuaria Integral, Manzanillo, MX

Following the COVID-19 pandemic, the port of Manzanillo was experiencing higher than normal demand for imports and exports. However, the increased warehouse traffic levels were causing damage to concrete slabs on the dock.

PROJECT TYPE

Dock repair

APPLICATION

Saw cut floor 

PARTNERS
  • Flooring contractor: Siteldi Constructora, S.A. 
  • General contractor: Administración Portuaria Integral de Manzanillo 
  • Ready-mix: Distribuidora y Comercializadora DCC 
Let's talk about your project
Dramix Customer success- Administración Portuaria Integral, Manzanillo, MX
PROJECT TYPE

Dock repair

APPLICATION

Saw cut floor 

PARTNERS
  • Flooring contractor: Siteldi Constructora, S.A. 
  • General contractor: Administración Portuaria Integral de Manzanillo 
  • Ready-mix: Distribuidora y Comercializadora DCC 
Let's talk about your project

Following the COVID-19 pandemic, the port of Manzanillo was experiencing higher than normal demand for imports and exports. However, the increased warehouse traffic levels were causing damage to concrete slabs on the dock.

The Challenge

Dramix Customer success challenge- Administración Portuaria Integral, Manzanillo, MX

Due to the intense loading and unloading schedules, it was not easy to find time to repair the dock floor with rod and/or mesh. In addition, as workers were on-site 24/7, their safety had to be taken into account during any repair operations.

Dramix Customer success challenge- Administración Portuaria Integral, Manzanillo, MX

Due to the intense loading and unloading schedules, it was not easy to find time to repair the dock floor with rod and/or mesh. In addition, as workers were on-site 24/7, their safety had to be taken into account during any repair operations.

The Solution

The floow was reinforced with Dramix® 4D steel fibers. In only three months a surface area of 1700 m2 was reinforced. The dock floor is now more durable because the distribution of the reinforcement in the slab makes it more resistant to heavy traffic as well as to inclement weather.

Thanks to Bekaert’s in-depth engineering expertise and resources, the Manzanillo Integral Port Administration saved time, reduced costs, ended up with a high-quality reinforced floor, and ensured worker safety at the same time.

The floow was reinforced with Dramix® 4D steel fibers. In only three months a surface area of 1700 m2 was reinforced. The dock floor is now more durable because the distribution of the reinforcement in the slab makes it more resistant to heavy traffic as well as to inclement weather.

Thanks to Bekaert’s in-depth engineering expertise and resources, the Manzanillo Integral Port Administration saved time, reduced costs, ended up with a high-quality reinforced floor, and ensured worker safety at the same time.