DSV Canada’s new headquarters location in Milton, Ontario, a suburb of Canada’s largest city Toronto, is a state-of-the-art logistics facility ideally positioned to serve the Canadian business-to-business (B2B) and business-to-consumer (B2C) markets.

PROJECT TYPE

Warehouse/distribution center

APPLICATION

Jointless floor

PARTNERS
  • General contractor: Leeswood
  • Engineer: Dorlan
  • Flooring Contractor: Metro Concrete
Dramix Customer success- DSV Global Transport & Logistics, Ontario, CA
PROJECT TYPE

Warehouse/distribution center

APPLICATION

Jointless floor

PARTNERS
  • General contractor: Leeswood
  • Engineer: Dorlan
  • Flooring Contractor: Metro Concrete
Download project sheet

DSV Canada’s new headquarters location in Milton, Ontario, a suburb of Canada’s largest city Toronto, is a state-of-the-art logistics facility ideally positioned to serve the Canadian business-to-business (B2B) and business-to-consumer (B2C) markets.

The Challenge

Dramix Customer success challenge- DSV Global Transport & Logistics, CN

A number of challenges existed during design and construction of this facility. It had to offer racking layout flexibility and wheeled traffic flexibility. It had to be constructed within a tight timeframe, and the overall cost of ownership had to be kept low.

Dramix Customer success challenge- DSV Global Transport & Logistics, CN

A number of challenges existed during design and construction of this facility. It had to offer racking layout flexibility and wheeled traffic flexibility. It had to be constructed within a tight timeframe, and the overall cost of ownership had to be kept low.

The Solution

Dramix® 4D steel fibers were used to reinforce over one million square feet of this logistics facility. A fast-track schedule and large pours possible with a jointless floor system allowed the completion of the slab within just four months. This new 1.1 million square feet (equivalent to 100,000 m2) facility is now the largest multi-customer logistics facility in Canada.

Dramix® 4D steel fibers were used to reinforce over one million square feet of this logistics facility. A fast-track schedule and large pours possible with a jointless floor system allowed the completion of the slab within just four months. This new 1.1 million square feet (equivalent to 100,000 m2) facility is now the largest multi-customer logistics facility in Canada.