Landmark retail, Dubai
PROJECT TYPE
Logistics and Warehouses
APPLICATION
Dramix® reinforced Warehousing Floor
PARTNERS
Engineer: AWAJ Consultants
Contractor: Amana Contracting
What we do

Download

Please provide the following details :

This is a mandatory field

This is a mandatory field

Please enter a valid email (e.g. johnsmith@domain.com)

Dramix flooring solution for Landmark’s expanding retail operations

Landmark Group developed its Landmark I facility in Dubai World Central to support the operations of one of the Middle East’s largest retail and hospitality organizations.

The challenge

 

The Landmark I facility required a durable industrial flooring system capable of supporting large scale warehousing activities and continuous material movement within a high-volume retail distribution environment. Long term floor reliability and operational efficiency were important for uninterrupted logistics operations.


The solution

 

Dramix® steel fibre reinforced concrete was selected to deliver a durable flooring solution for the Landmark I facility in Dubai World Central. The fibre reinforced slab provided reliable structural performance and long-term durability for demanding warehouse operations while supporting efficient floor construction across the 75,000 m² project area. 

Talk to an expert

Let’s talk about your project and discover what Dramix® fibers can do for you.