Al Shaya, Bahrain
PROJECT TYPE
Industrial Warehouse Flooring
APPLICATION
Warehouse Flooring using Dramix® 3D 80/60 BG
PARTNERS
Owner: Al Shaya
Consultant: Salah Al Kooheji
What we do

Download

Please provide the following details :

This field is required

This field is required

Please enter valid email (e.g. johnsmith@domain.com)

Supporting Al Shaya’s retail development with efficient Dramix flooring Pvt. Ltd.

Completed in 2016, the 8,000 sqm Al Shaya project in Bahrain supports the company’s diverse retail operations across major malls and high streets. As a leading multi-brand retailer in the region, Al Shaya continues to expand its footprint, creating spaces that accommodate a wide range of international consumer brands.

The challenge

 

To meet the needs of its extensive retail and logistics activities, the project required a durable flooring system suitable for high-traffic movement, storage functions and daily operational loads. The large 8,000 sqm area demanded a reliable solution that could be constructed efficiently while delivering long-term performance for Al Shaya’s retail environment.


The solution

 

Dramix 80/60 steel fibre reinforcement was selected to support the project’s flooring requirements across the 8,000 sqm site. By replacing traditional reinforcement, Dramix enabled smoother and faster installation, reducing on-site complexity. The fibres provided consistent crack control and durable performance, making them suited for the operational demands of Al Shaya’s commercial and retail facilities. The overall solution contributed to a robust and efficient flooring system aligned with the project’s functional needs.

Talk to an expert

Let’s talk about your project and discover what Dramix® fibers can do for you.