Please provide the following details :
This is a mandatory field
This is a mandatory field
Please enter a valid email (e.g. johnsmith@domain.com)
Landmark Group developed its first large-scale facility in Dubai to support the operations of one of the Middle East’s largest retail and hospitality conglomerates.
The facility required a durable industrial flooring system capable of supporting continuous warehouse operations and large-scale material movement across a high-traffic logistics environment. Long-term floor reliability and operational performance were critical for daily distribution activities.
Dramix® steel fibre reinforced concrete was selected to deliver a durable flooring solution for the Landmark facility in Dubai. The fibre reinforced slab provided enhanced structural performance and long term durability for demanding warehouse operations. The solution also supported efficient construction while delivering reliable industrial floor performance across the 75,000 m² project area.